Stuck at the same weight? Eat meat, and let Vore do the math.

Tell Vore your goal weight. It sets your fat and protein targets, maps what your weight should do each week, and logs your meals from a photo.

Scan to get Vore on your phoneFree on iPhone and Android

QR code that opens Vore in the App Store or Google Play
4.6 on the App Store|90,000+ downloads|"Lost 40 pounds"

Free to start. Or start a free trial on the web.

Vore Food Snap camera framing a ribeye steak and two eggs Vore log for today: challenge day 20 of 30, coach note, fat 159 of 190 g, protein 161 of 200 g, 2,120 of 2,600 kcal

Seven in ten people who join Vore are brand new to carnivore. Most of them tried keto or fasting first.

90,000+downloads4.6App Store rating100+recipes

A plan for your weight, not a calorie count.

Onboarding asks where you are and where you want to be. Vore turns that into fat and protein targets in grams, a carb ceiling, and a week-by-week weight timeline. Then it keeps score: every weigh-in lands on the chart against your goal line, next to what you ate.

  • Fat-to-protein ratio set for your goal, adjustable any time
  • A carb ceiling, not a carb goal
  • Weight timeline and a first insight after day one
  • Targets update as you log
Weight & goal line
starting, latest, goal
Body measurements
waist, hips, chest, arms
Vitals
blood pressure, ketones, glucose
Insights
a written read of your last weeks
Progress chart: weight down from 189.4 to 180.8 lb over a month against a 177 lb goal line

Snap the plate. Vore does the logging.

A photo, a sentence out loud, a nutrition label or a barcode. Vore names the foods, estimates the portions in ounces or grams, and fills in fat, protein and calories. Fix anything before you save.

People who log by photo in their first week are 40% more likely to still be logging a week later.

PhotoVoice or textNutrition labelBarcodeSearch & My Foods
Food Snap result: Ribeye & Eggs, 2 items, 54 g fat, 60 g protein, 740 calories, ready to add The two items it found: Ribeye Steak 8 oz, 600 calories, 44 g fat, 48 g protein; Eggs 2 large, 140 calories, 10 g fat, 12 g protein, each editable

The hard part isn't the meat. It's the fifth ribeye this week.

Over 100 carnivore recipes, from a ribeye guide to carnivore pizza and ice cream. Twenty ready-made weekly plans you can drop onto your week and swap around. A cuts guide for the butcher counter. And a shopping list generated from whatever you planned, grouped by aisle.

100+ recipes20 weekly plansCuts guideShopping listAnimal-based options
See the meal plans
Recipes: new premium recipes, 48 carnivore recipes including Carnivore Pizza, 32 animal-based Meal planner: Monday with scrambled eggs and bacon, meatballs, ribeye with butter and beef liver chips, 2,610 calories

Cravings ended your last diet. The 30-Day Challenge is built for that.

One task a day for thirty days, from "eat only meat today" to ordering at a restaurant without apologizing. A coach note each morning, written from what you actually logged. Milestones shared with the people who started the same week you did.

  • A day completes when you log a meal
  • The coach reads your log, so the advice is about your protein, not protein in general
  • Week 1 is adaptation, week 2 habits, week 3 optimization, week 4 living it
30-Day Challenge: day 20 of 30, today's focus Eating Out Carnivore Style, coach's tip, 20 days completed Daily coach note: 20-day streak, dropped 3.3 lb, get protein up from 125.7 g to the 200 g goal, grill the saved ribeye

What a generic tracker won't do.

Calorie apps were built for a different diet. Here is what changes when the app assumes you eat meat.

VoreCalorie counter
Log a meal from a photo or by saying it —
Fat-to-protein targets instead of a calorie budget —
A carnivore-only recipe library and cuts guide —
Weekly meat plans with a generated shopping list —
A 30-day challenge with a coach that reads your log —
The same account on your phone and your computer —

What carnivores say.

4.6
App Store rating
90,000+ downloads
"So far this is great. Just uploaded the app and analyzed my meal. It's great to [be able] to see the fat, protein and calories of my meals without guessing at it."
Dar L.Google Play review
"Very easy to log meals either by scanning the meal [or] a brief description of it."
Robert M.Google Play review
"Scan UPC barcodes, enter recipes, and track exercise. You can also change your macro goals in case you transition to a different diet."
Gabriel W.Google Play review

Also on your computer.

The whole tracker at web.voreapp.com. Same account, same log, a real keyboard. Plan the week on a big screen and let the phone handle the steak photos. Included with Premium.

Vore on the Web: today's log with the challenge card, coach note and macro ring

Questions

Is Vore free?

Yes. Logging, the food database, favorites and the daily macro summary are free. Premium adds unlimited AI photo, voice and label logging, the 20 weekly meal plans with shopping lists, the daily coach, advanced progress and the web app. Most members take the yearly plan at $39.99, and a free trial is included.

I am new to carnivore. Is this for me?

Most people who join Vore are. Onboarding asks about your goal, your weight and how you like to eat, then builds your fat and protein targets and a weekly weight timeline. The 30-Day Challenge walks you through the first month one task at a time.

How does the plan work?

Tell Vore your goal weight and activity. It sets a fat-to-protein ratio in grams, a carb ceiling, and maps what your weight should do each week. The targets update as you log, and Progress shows whether you are on track.

Does it work for lion diet, animal-based and keto-to-carnivore?

Yes. Set your own ratio and carb ceiling, hide the foods you do not eat, and use the challenge to ease in from keto. Dairy, eggs and fruit are tracked like any other food, so elimination protocols work too.

Can I use it on my computer?

Yes. Vore on the Web at web.voreapp.com is included with Premium: the same account, the same log, a real keyboard. Log lunch on your laptop and it is on your phone moments later.

Start with your goal weight.

Free on iOS and Android. Premium unlocks the meal plans, unlimited photo logging, the coach and the web app.

QR code that opens Vore in the App Store or Google Play

Scan to get Vore on your phone

Snap your plate and Vore logs the fat, protein and calories.

Free on iPhone and Android

Or start a free trial on the web.